ELECTRICAL INSTALLATION MAINS POWER SUPPLY MEASUREMENT, AUDIT, LOAD RECORDING & ANALYSIS SERVICES.

ELECTRICAL INSTALLATION MAINS POWER SUPPLY MEASUREMENT, AUDIT, LOAD RECORDING & ANALYSIS SERVICES.

PRIME TECHNOLOGIES Inc. uses the PM3000 &  PM6000 Ranger Power Loggers from SYNERGY INC.

PRIME TECHNOLOGIES Inc. is recognized as having the credentials to analyze any power system issue at any facility.

Develop and implement a wide range of solutions based on recordings made with the PM Series Power Loggers.

In our opinion: they are the best value 3 phase, 4 wire  power quality, harmonic & transient voltage surge/spike capturing loggers on the market today.

The PM3000 & PM6000 measure almost every aspect of the electricity you're supplying or receiving, so it is a must for utility, electricity and power supply companies as well as large industrial and commercial consumers, from heavy machinery plants to hospitals and supermarkets (see Who uses it?).

pm3000 image

 

 

 

Key features include:

  • Patented Single Cycle Adaptive Storage recording process provides extremely high resolution over long recording periods.
  • Measures current between 0 and 1,000 Amps and voltage between 0 and 480 Volts on single phase, two phase and three phase power supplies.
  • Records and displays up to 16 channels of voltage, current, power, power factor, VARs, phase angle, frequency, THD, and much more.
  • Comprehensive range of math functions give excellent data analysis.
  • Graphical touchscreen interface provides straightforward, user-friendly operation.
  • Comes with Pronto for Windows software, one of the most highly regarded
  • data recovery and analysis packages available.

The Ranger PowerMaster 6000 is a user-friendly, comprehensive, compact and cost-effective power quality monitoring unit. It offers virtually everything needed to monitor and record power for surveys and audits. It includes 3 voltage input channels capable for measuring 0 to 600 Vac and 3 current input channels for use with current outputs. Eleven pre-stored configurations are set for 3 phase, 2 phase and single phase measurements. Users can also configure their own set-up and math calculation requirements and save them to non-volatile memory.

  • 800 Waveform Captures of Transients, Notches, Sags, Surges, Rings, Harmonics, etc.
  • Graphical touchscreen user interface provides straightforward, user-friendly operation
  • Resident on-line help
  • Records and displays up to 32 channels of voltage, current, power, power factor, VARs, phase angle, frequency, THD, odds,evens, triplens, harmonic direction, imbalance, K-factor and much more
  • Records harmonic magnitude and direction over time to a single cycle resolution
  • Real-time text, phasor diagram or harmonic bargraph displays
  • RS422, RS485 and RS232 with Modbus ASCII protocol or modem communications
  • Adapts to most existing CTs
  • Powered independently by AC measurements circuits or optional line cord for voltages below 90 volts
  • Password protected
  • Rugged, compact, lockable, NEMA 4X case.

Our Services Include:  

Power Quality and Power Systems Consulting: From time to time, a facility              needs to engage the services of an expert in the area of power quality issues.

Energy expenditure reductions: Load profile can be generated to track                          daily, weekly and seasonal variations in energy consumption, while critical                      loads can be metered and sub-metered to evaluate consumption and                            reduce energy costs.

Perform Preventive Maintenance Activity-based Costing: Track energy-related costs by department, floor, process or equipment and machinery performance, function and output. Revenue-accurate metering allows for easy cost comparison with utility bills.

Perform Energy Conservation and Load Reduction: Shed non-essential                   loads or bring distributed generation on line to reduce consumption and/or               participate in utility-sponsored demand reduction programs. Evaluate the value of energy efficient equipment such as lighting and HVAC changes.

Reduce Demand Peaks and Related Costs: Avoid demand surcharges                            to predict kW demand and identify the cause of demand  peaks and limit (kva) peak occurrences. Generate alarms on events such as excessive load, equipment                   failure, or when operations are likely to exceed contract terms for service or energy supply.

Evaluate Impact of Production Equipment on Energy Costs: Monitor the            efficiency of large, energy-consuming equipment to improve performance. 

Plan for expansion by analyzing load trends and available capacity for new equipment.

 

Permanently Installed, Continuous Monitoring Systems: The continuous capture

of power quality and energy data puts facility managers in a position to proactively manage

their power infrastructure, by increasing their knowledge and giving them the tools to increase

system reliability.
Power Quality Software: Interpreting power monitoring data can be an overwhelmingly complex and

time-consuming task. Prime Technologies prides itself on having the most user-friendly power quality

software on the market which can enable you to manage and monitor your facility from your office or

computer network at your facility.                  

WHY YOU SHOULD CONSIDER: To analyze the power supply system at your facility and

develop and implement the following excercise. 

Predictive Maintenance Program
Power consumption & quality of electricity.

The power consumption is a direct indicator of the proper operation of electrical equipments. In some cases, it allows to choose the electric circuit on which to add new equipment.

Do you have any doubts about the quality of the electricity delivered to your systems? Why not check and tell the supplyer to correct their problems before they become YOURS.

The majority of electrical defects generate warnings anomalies often undetectable "to the naked eye," before creating an emergency. When the air conditioner stops working two seconds from time to time, nobody realizes this, but this would be the best time to schedule the verification of the problem. In addition, when the problem is found, spare parts can be ordered at a reasonable price without being shopped "RUSH" because the entire company stopped.

 

 

 

 

 

Search site